Spring Manufacturing Route and Customer Acceptance
It should identify controlled stages and the evidence that verifies agreed requirements, without implying unsupported factory capabilities.
It should identify controlled stages and the evidence that verifies agreed requirements, without implying unsupported factory capabilities.
Conditions can change over the run, and the pilot should reveal relevant start, middle and end behavior.
Use appropriate measured data, a defined characteristic and a stable process with a valid analysis method.
Link the approved drawing revision to purchasing, work instructions, tooling setup and inspection records.
Define the input population, accepted quantity, rework and rejects for a stated batch and inspection stage.
Protect critical end geometry, surface condition and part identity according to the approved handling route.