Spring Commercial Lead Time with Technical Dependencies
State the actual quoted lead time and the events that start it, such as drawing approval, material confirmation or tooling release.
State the actual quoted lead time and the events that start it, such as drawing approval, material confirmation or tooling release.
The agreed characteristics, methods, sample identities, actual results and disposition for the shipped lot.
Specify the links needed between delivered lots, material, manufacturing and inspection records, including retention and access expectations.
Define changes relevant to material, process, location, tooling, inspection or sub-supply that could affect the approved product.
List the accepted scope, unresolved items and conditions that must be met before production release.
Identify the controlling drawing, revision, output limits, inspection method and required delivery records.