A controller restart can interrupt the relationship between cycle count, position and recorded time. Appending the resumed data to the earlier file without marking the interruption can make one continuous spring test appear to have occurred when it did not.

Preserve the interruption
Record when logging stopped, what the mechanism was doing and which references were lost or retained. Distinguish a software logging restart from a physical stop or power change. They need not happen together.
Keep the last known sample and the first resumed sample identifiable. Do not fill an unknown interval with an assumed motion or count merely to produce a continuous trace.
Establish the resumed state

The approved recovery procedure should define how position, sample identity and any cycle counter are confirmed. A reset counter reading does not prove that the spring returned to its original installed state.
If the interruption changes conditioning or dwell, retain that information with the subsequent measurements. The resumed segment may still be useful, but it should not silently inherit conditions that no longer apply.
Report the valid segments and the unresolved gap separately. Acceptance can then follow the agreed treatment of interruptions rather than a reconstructed history. This protects both the component conclusion and the traceability of a later comparison with another spring revision.

For the broader background, read Spring Test Report with Deviations and Interruptions.
Explore related spring information or discuss this mechanism with a non-confidential description.