Quick answer: Use an agreed decision rule based on the method's uncertainty and the specified limits.

How should uncertainty appear in a pass-fail decision?
Instrument resolution alone is not total uncertainty. Fixture alignment, repeatability and setup can contribute. A result close to a limit deserves the agreed interpretation rather than automatic rounding into compliance. Record the uncertainty basis with the result.

A practical verification method
Review the measurement method and decision rule before accepting borderline results.
| Item | What to record | Purpose |
|---|---|---|
| Reference configuration | Part or assembly identity and drawing revision | Make comparisons traceable |
| Test conditions | Relevant position, direction and operating condition | Compare the same characteristic |
| Decision evidence | Review the measurement method and decision rule before accepting borderline results. | Resolve the specific question before approval |

Use the result in an engineering request
Describe the observed condition and the required function separately. Include the relevant drawing revision and your results from the check above. If an acceptance limit has not been established, identify it as an open design input rather than treating a successful trial as approval.
Review the related Leading Spring product information. For a project-specific review, send the mechanism description, available geometry and the evidence relevant to this decision through the contact page.
Editorial note: AI-assisted engineering guidance, prepared from the topic-specific reasoning shown here and the company’s public product context. Illustrations explain decisions; they are not customer-case photographs or test results. Product-specific suitability requires review against your approved requirements.